Economic & Industrial Statecraft · Change

Watch delivery, not announcements.

Sixteen indicators track whether financial leverage, physical exposure, coalition implementation, and operating capacity are changing. Eight priorities address the constraints visible in the evidence.

16 indicators8 policy prioritiesObservation dates preserved
Indicators

Measures that can change the call.

Where public outcome data do not exist, the gap is stated directly. A funding award, agreement, or announced facility is not counted as delivered capacity.

IndicatorBaselineSignalWhy it matters
EI-I01 · System leverageDollar share of disclosed reservesUpdated: Quarterly
57.13%As of 2026 Q1
Measurement definition
Measure
Stock share
Unit
Percent of allocated reserves
Numerator
Allocated official foreign-exchange reserves held in U.S. dollars
Denominator / baseline
Total allocated official foreign-exchange reserves reported to COFER
Treatment
Current-value composition; exchange rates can change shares without transactions
Revision policy
Replace with each IMF quarterly vintage and retain the observation date
Broadly stable; valuation-sensitive

Tracks one foundation of financial reach, not sanction effectiveness by itself.

EI-I02 · System exposureU.S. net international investment positionUpdated: Quarterly
-$21.27 trillionAs of 2026 Q1
Measurement definition
Measure
Net financial-position stock
Unit
Current U.S. dollars
Numerator
U.S.-owned foreign financial assets minus foreign-owned U.S. financial assets
Denominator / baseline
No denominator in the headline level; GDP and gross-asset ratios are separate measures
Treatment
Nominal market-value position affected by transactions, prices, and exchange rates
Revision policy
Use the latest BEA quarterly vintage and identify revisions
Large external balance-sheet exposure

Provides context on deep capital-market integration and valuation exposure.

EI-I03 · Industrial structureSemiconductor production value-added shareUpdated: Annual
China 30% · Taiwan 23% · U.S. 19% · South Korea 11%As of 2024
Measurement definition
Measure
Annual value-added share
Unit
Percent of global semiconductor manufacturing value added
Numerator
Economy-level semiconductor manufacturing value added in the NSF estimate
Denominator / baseline
Global semiconductor manufacturing value added in the same estimate
Treatment
Source-defined value added; not wafer starts, yield, or leading-edge-node capacity
Revision policy
Update only with a comparable NSF vintage and preserve methodological breaks
Geographically concentrated

Shows production weight, while remaining distinct from leading-edge node capacity.

EI-I04 · InnovationU.S. R&D intensityUpdated: Annual
3.4% of GDPAs of 2024 / latest harmonized estimate
Measurement definition
Measure
Annual intensity ratio
Unit
Percent of GDP
Numerator
U.S. gross domestic expenditures on research and development
Denominator / baseline
U.S. gross domestic product for the harmonized observation year
Treatment
Source-defined ratio; measures inputs rather than innovation outcomes
Revision policy
Use the latest harmonized NSF vintage and disclose underlying-series revisions
High but contested

Measures input intensity; translation to production must be tested separately.

EI-I05 · InnovationChina share of AI international-priority patentsUpdated: Annual with lag
75%As of 2024
Measurement definition
Measure
Patent-family share
Unit
Percent of AI international-priority patent families
Numerator
AI international-priority patent families attributed to China
Denominator / baseline
Worldwide AI international-priority patent families in the cited NSF series
Treatment
Counts protected invention families; does not weight quality, citation impact, or deployment
Revision policy
Update with comparable annual vintages and retain the publication lag
High and rising

Signals scale in protected invention; quality and deployment require separate evidence.

EI-I06 · Input concentrationAverage top-refiner share, key minerals excluding rare earthsUpdated: Annual
72%As of 2025
Measurement definition
Measure
Basket concentration share
Unit
Average percent share
Numerator
Leading refining country's share for each mineral in the IEA basket
Denominator / baseline
Global refined output for each covered mineral, averaged excluding rare earths
Treatment
IEA basket and stage definitions; the average can hide material-specific variation
Revision policy
Update with each IEA outlook and preserve basket or methodology changes
Up from 70% in 2023

Tracks whether diversification changes the actual processing bottleneck.

EI-I07 · Coercive exposureMineral tariff codes under Chinese export controlsUpdated: Event-driven
Three times the 2023 countAs of 2026 report
Measurement definition
Measure
Policy-scope index
Unit
Multiple of the 2023 tariff-code count
Numerator
Mineral tariff codes covered by Chinese export-control measures in the cited report
Denominator / baseline
Comparable covered tariff-code count in 2023
Treatment
Counts formal product scope, not license denials, shipment disruption, or economic effect
Revision policy
Revise after an implemented control change or comparable IEA recount
Expanded

Shows expansion of controlled product scope; license approvals and realized shortages remain separate.

EI-I08 · Diversification financeAdvanced-economy public finance commitments for critical mineralsUpdated: Annual
About $65 billionAs of 2025
Measurement definition
Measure
Cumulative public-finance commitment
Unit
Nominal U.S. dollars
Numerator
Advanced-economy public-finance commitments identified by the IEA
Denominator / baseline
No denominator; this is a headline cumulative commitment level
Treatment
May combine unlike instruments; does not equal disbursement, qualification, or output
Revision policy
Update with each IEA inventory and identify scope changes where disclosed
More than four times 2023

Measures commitment; disbursement and qualified output are the delivery tests.

EI-I09 · Project deliveryCHIPS milestones reported completeUpdated: At each GAO or Commerce portfolio release
24 of 161As of July 2025
Measurement definition
Measure
Unweighted milestone completion count
Unit
Completed milestones out of total contractual milestones
Numerator
Milestones that recipients reported complete
Denominator / baseline
161 milestones in the reviewed portfolio, whether or not all were due by the cutoff
Treatment
Milestones differ in value and timing; completion is not equivalent to qualified output
Revision policy
Replace only with a comparable portfolio release and preserve the reporting cutoff
Early portfolio stage

Separates award announcements from delivery.

EI-I10 · Project deliveryCHIPS-funded projects certified completeUpdated: At each portfolio release
1 leading-edge facilityAs of June 2025
Measurement definition
Measure
Certified facility count
Unit
Facilities
Numerator
CHIPS-supported leading-edge facilities certified complete
Denominator / baseline
No comparable completed-versus-due denominator is published in this headline
Treatment
Certification is not product qualification, sustained yield, utilization, or cost competitiveness
Revision policy
Update with GAO or Commerce certification records and retain facility scope
First completion

Marks the first completed facility; product qualification, yield, utilization, and cost remain to be assessed.

EI-I11 · Energy resilienceRussian share of EU gas importsUpdated: Annual / phase-out milestones
12%As of 2025
Measurement definition
Measure
Import-flow share
Unit
Percent of EU gas imports
Numerator
EU gas imports originating in Russia
Denominator / baseline
Total EU gas imports in the same period
Treatment
Physical import share; changes reflect Russian volumes and other-supplier volumes
Revision policy
Update with comparable EU annual data and record legal milestones separately
Down from 45% in 2021

A physical dependency outcome rather than a policy-activity count.

EI-I12 · Energy resilienceRussian piped-gas deliveries to the EUUpdated: Quarterly / annual
Down 90% from 2021As of 2025
Measurement definition
Measure
Physical-flow change
Unit
Percent change from 2021
Numerator
Russian pipeline-gas volume delivered to the EU in the observation year
Denominator / baseline
Russian pipeline-gas volume delivered to the EU in 2021
Treatment
Pipeline flow only; excludes the separate LNG channel and total transition cost
Revision policy
Use comparable IEA flow vintages and preserve the 2021 baseline
Sharp diversification

Cross-checks the import-share measure with physical flow.

EI-I13 · Maritime resilienceU.S. oceangoing commercial ship constructionUpdated: Annual
Routinely 3–5 ships per yearAs of MARAD strategy study, 2026
Measurement definition
Measure
Annual production flow
Unit
Oceangoing commercial ships completed per year
Numerator
Qualifying oceangoing commercial ships constructed in the United States
Denominator / baseline
One calendar year; no tonnage or complexity weighting in the headline
Treatment
Hull count does not measure tonnage, vessel complexity, repair, or naval output
Revision policy
Update with a comparable MARAD or official annual construction series
Capacity constraint

A concrete regeneration bottleneck distinct from port and naval capacity.

EI-I14 · Campaign outcomeRussia macroeconomic growth effectUpdated: When a comparable causal estimate is published
About -6 percentage points versus counterfactual in 2022; no statistically different result in 2023–24As of GAO analysis, 2025
Measurement definition
Measure
Model-estimated causal effect
Unit
Percentage-point difference in GDP growth
Numerator
Estimated observed-minus-counterfactual Russian GDP growth effect
Denominator / baseline
Model counterfactual for Russian growth absent the assessed shock package
Treatment
Not a raw growth rate or one-instrument estimate; later effects were not statistically different
Revision policy
Update only with a comparable causal estimate and preserve uncertainty intervals
Initial shock; adaptation

Demonstrates why a campaign needs time-bounded outcome targets rather than designation totals.

EI-I15 · Coalition deliveryIPEF crisis-response performanceUpdated: After exercises or activations
No comprehensive public response-time or exercise-outcome series locatedAs of 2026-08-07
Measurement definition
Measure
Missing outcome series
Unit
Not yet defined from public evidence
Numerator
Observed response time, coordinated actions, or resolved supply shortfalls
Denominator / baseline
A comparable disruption or exercise baseline
Treatment
Meetings and agreements are inputs and are not substituted for performance observations
Revision policy
Create a baseline only after a public exercise, activation, or after-action result
Unknown

Without comparable response-time or exercise results, coalition crisis performance cannot yet be judged from public evidence.

EI-I16 · Control effectivenessAdvanced-chip diversion and foreign availabilityUpdated: Annual outcome review
No consolidated public outcome series locatedAs of 2026-08-07
Measurement definition
Measure
Missing outcome series
Unit
Not yet defined from public evidence
Numerator
Observed access to diverted or foreign-available advanced-chip capability
Denominator / baseline
Controlled capability and a matched pre-control or comparator baseline
Treatment
Rule counts, licenses, seizures, and anecdotes are not combined into a synthetic measure
Revision policy
Create or update only when a consolidated reproducible outcome series is public
Unknown

The decisive control variable is access to comparable capability, not the number of rules.

Policy priorities

Where action could strengthen leverage.

These options target constraints identified in the research. Each includes observable evidence for judging whether implementation is producing real capacity or strategic effect.

01

Report progress from authorization through sustained output

For every industrial initiative, report authorized, obligated, disbursed, under-construction, equipment-installed, qualified, operating, and sustained-throughput stages separately.

Evidence of progress
Share of projects and dollars at each stage, together with schedule variance and unit-cost evidence.
02

Map the binding stage of each dependency

Trace strategic products through mine or feedstock, processing, tools, components, qualification, logistics, maintenance, and workforce before assigning a vulnerability.

Evidence of progress
Concentration, time-to-substitute, qualified capacity, inventories, and recovery time at the actual bottleneck.
03

Define the objective—and when to adjust or end the policy

Define the target behavior or capacity, transmission mechanism, time horizon, acceptable sender cost, escalation bounds, and conditions for tightening, adapting, or ending the instrument.

Evidence of progress
Observed target behavior and capacity versus a stated counterfactual—not designations, tariffs, or license counts alone.
04

Pre-negotiate coalition implementation

Agree definitions, coverage, licensing, exceptions, enforcement information, burden sharing, and review schedules before a crisis.

Evidence of progress
Jurisdictional coverage, implementation lag, exception rate, enforcement capacity, and exercise response time.
05

Finance balanced chains and credible demand

Pair upstream projects with processing, components, workforce, infrastructure, qualification, and long-duration offtake instead of financing isolated assets.

Evidence of progress
Qualified downstream capacity relative to upstream output, contracted demand, cost gap, and time to commercial throughput.
06

Stress-test physical and institutional resilience

Run disruption exercises against minerals, ports, energy, payments, cloud, components, and key logistics; publish bounded after-action findings.

Evidence of progress
Detection time, inventory days, alternate-route activation, output loss, recovery time, and unresolved authorities.
07

Protect the foundations of financial leverage

Treat rule of law, market depth, policy predictability, payments resilience, and coalition legitimacy as capabilities that require maintenance.

Evidence of progress
Reserve and funding shares adjusted for valuation, market liquidity, partner participation, and substitution behavior.
08

Track adaptation as aggressively as pressure

Maintain a countermeasure register covering rerouting, front companies, technical substitution, fiscal support, retaliation, inventory use, and third-country intermediation.

Evidence of progress
Time and cost to route around the instrument, residual denial, sender leakage, and policy update cycle.